×

Announcements

  • 15 October 2021

    Our Security Works at Our Site Doors

    Security Gaps On Our Doors Are Resolved The gaps under, above and next to the site doors are detected and closed one by one. Our site will be more secure by performing these actions in order for all areas that create security gaps.

    Detail
  • 15 October 2021

    Public WC Works In Our Zones

    Our Zones Get Its Toilets Again… Our toilets, located on our 23rd zone, which were unfortunately destroyed and used for other purposes, were emptied by the users, modified, cleaned and put into service. These (toilets) areas, which are in great need on our zones, are now available for useage again. To do is from us…

    Detail
  • 5 October 2021

    Lighting Works on Our Site

    We replace the old lamps in all the streets of our site with new LED models, we make additions to the missing places. Our entire site will shine bright

    Detail
  • 3 October 2021

    Speed Breaker Bumper Works

    We are making speed-breaking bumps on all our streets that pose a risk of accident. We are trying to prevent the risk of accidents by writing the spped limits in front of these bumps and we are trying to keep our site safer. Deceleration bumps will be made in all risky areas as their turn…

    Detail
  • 3 October 2021

    Our First Mobile Parking Lot

    As a solution to the problem of parking space, which is the biggest problem of our cooperative, we are transforming all of our idle areas within the site into small mobile car park areas. The construction of our first mobile car park continues rapidly

    Detail
  • 3 October 2021

    Arrangements On Our Site

    The works of laying screed on the floor and installing the doors of approximately 35 pcs 120 sqm workplace in our site, which have been kept idle because they have not been completed until today, are continuing rapidly. After these works are completed, our workplaces will be rented out. Additionally, the terrace floor insulation and…

    Detail
  • 15 September 2021

    Covit 19 Vaccine Campaign

    In our second vaccination campaign organized by our cooperative management together with the District Health Directorate, 325 tradesmen were provided with the covit 19 vaccine. We thank to everyone who contributed

    Detail
  • 23 August 2021

    Vaccine Campaign

    In our vaccination organization, which we organized together with our District Health Directorate on our industrial site in Dolapdere, 412 tradesmen were vaccinated today.Many thanks to everyone who contributed.

    Detail
  • 29 June 2021

    Board of Directors Change

    Ömer HANOĞLU, Member of the Board of Directors, took over the presidency of the cooperative with a new team at the 2020 Ordinary General Assembly Meeting.

    Detail